Current Projects
Denison Water Treatment Plant Paving
Date: Sep 1, 2011
Absolute worked with Story Construction on this project.
Scope of work includes:
16,850 SF of 7" Paving
106 LF of 12" tall curb
375 SF of 4" Sidewalk
view »
Area Diesel
Date: Aug 30, 2011
Absolute worked with H & H Construction in Pleasant Hill on this project.
Scope of work includes:
1,198 LF of Footing / Walls
42 Piers / Pads
6,900 SF of Slab
19,697 SF of Paving
1,152 SF of Sidewalk
10 bollards
...
view »
Kinze Product Center
Date: Aug 30, 2011
Scope of work includes:
257 LFof Walls / Footings
21,827 SF of Slab
view »
73rd & University Bridge Approach in Clive
Date: Aug 9, 2011
Absolute Concrete will be assisting Jensen Construction in the Reconstruction and Bridge Widening of the University Ave Bridge over Walnut Creek, located in Clive, IA.
Scope of Work:
1,786 SY of PCC Paving, Includes Bridge Approach, Paving & Sidewalk Improvements.
...
view »
Peatec Office Building Parking Lot
Date: Aug 8, 2011
Absolute will be performing the exterior paving and sidewalk for Hunter Construction on this project in Hiawatha, IA.
Scope of Work:
148,650 SF 6" Paving
5,210 LF Curb & Gutter
5,358 Tons of 6" Depth Rock Sub-base
8,420 SF of 5" Sidewalk
view »
City of Dexter Sidewalk Replacement
Date: Aug 1, 2011
Absolute has been granted the contract for the City of Dexter, Safe Routes to School, Sidewalk Replacement, Removal & Replacement of Sidewalks around varied sections of the town. This will provide safe & economical walkways for all residents to use.
Scope...
view »
Ankeny Subway Restaurant Paving
Date: Jul 30, 2011
Absolute worked with Dean Snyder on this project.
Scope of work includes:
16,948 SF of Paving
3,335 SF of Sidewalk
565 LF of Curb & Gutter
view »
Merle Hay Rd & Urbandale Ave. Paving
Date: Jul 29, 2011
Absolute worked with Reilly Contractor on this project.
Scope of work includes:
1,886 SY of 9" Paving
143 SY of 7" Paving
879 SY of 8" Paving
37 SY of 14" Paving
180 SY of 6" Median
1,000 SY of 4"...
view »
Mason City Hy-Vee Remodel & Site Paving
Date: Jul 25, 2011
Absolute is working with Hy-Vee Weitz to pour several island patches in the parking lot and replace much of the entrance paving, sidewalk and loading dock area at the existing #2 Hy-Vee in Mason City.
Scope of Work:
14,345 SF of 7"...
view »
Des Moines Fire Logistic & Training Facility
Date: Jul 11, 2011
Absolute is working with Dean Snyder Construction on this project.
Scope of work consists of:
Footings - 1,845 LF
Walls - 50 LF
Column Pads - 72 Pads
Slab/Flatwork - 50,395 SF
6" Paving - 11,475 SF
8" Paving - 38,765...
view »
Iowa Beef Systems Cattle Lot - Sac City
Date: Jun 16, 2011
Absolute is providing a state of the art Cattle facility for Iowa Beef Systems in Sac City, IA.
Scope of work:
2,216 LF of Footings / Walls
56,950 SF of Slab
20 Pier Pads
view »
Pioneer Krug/Mendel Building Additions & Site Work
Date: Jun 1, 2011
Graham Construction is building 5 additions at the Pioneer Facility in Johnston. Absolute Concrete along with Manatts will be performing all the parking lot, sidewalk and main roadway paving. In addtion, Absolute will be placing the slabs for Greenhouses G...
view »
Latter Day Saints Parking-lot in Waukee
Date: May 22, 2011
Scope of work includes:
24,488 SF of Paving
223 SF of Sidewalks
view »
Woodward Resource Parking Lot
Date: May 1, 2011
Absolute is the Prime on this parking lot replacement project for the State of Iowa. Project includes 8" PCC Paving, 5" sidewalk and 5" slab. Elder Corporation will be performing the demolition and earthwork.
Scope of Work:
27,140 SF 8" Paving
1,355 SF...
view »
Cass County Hospital Addition - Atlantic
Date: Apr 29, 2011
This project consist of 2,260 LF of Footings; 51,110 SF of Slab work; 34,510 SF of Paving; and 6,760 SF of Sidewalk.
view »
Cornerstone Church Parking Bays
Date: Apr 15, 2011
Absolute is the prime contractor on this project working with Cornerstone church to complete two parking lot bays for the new church. It will be a fast tracked project.
Scope of Work:
15,660 SF of 6" Paving Bay & 18,020 SF of...
view »
Grinnell College Parking Lot & Sidewalks
Date: Apr 1, 2011
Grinnell College Parking Lot & Sidewalks - Grinnell, IA
Scope of work:
Paving - 50,168 SF
Sidewalk - 11,688 SF
view »
Blank Park Zoo Quarantine Building
Date: Apr 1, 2011
Absolute worked with Neumann Brothers & Corell Contractors on this project.
Scope of work is as follows:
Footings & Walls - 1,417 LF
Slab/Flatwork - 8,768 SF
Paving - 10,342 SF
Curb & Gutter - 148 LF
view »
Blank Park Zoo Australian Exhibit
Date: Apr 1, 2011
Absolute worked with Neumann Brothers & Elder Corp. on this project.
Scope of work is as follows:
Wallaby Barn Slab - 2,450 SF
Bird Barn Slab - 657 SF
Colored Sidewalk/Path - 3,500 SF
Colored Patio - 500 SF
view »
ISU Flood Walls at Hilton & Scheman Buildings
Date: Mar 21, 2011
Absolute worked with R.H. Grabau Construction on this project.
Scope of work:
HILTON
Trench Footings - 32 LF
12" Thick Colored Flood Walls - 268 LF
5" Slab - 315 SF
5" Sidewalk - 260 SF
SCHEMAN
Spread Footings - 176 LF
12"...
view »
2011 Waterloo Renaissance Trail on the Cedar River
Date: Mar 1, 2011
Absolute Concrete will be preforming work under contract for Vieth Construction out of Cedar Falls. Concrete work will start along the Cedar River in Waterloo, in the spring of 2011. Absolute will start paving the trail at Mullan Ave on...
view »
BETHEL CHURCH
NORTH HIGH SCHOOL RENOVATION & ADDITION
Date: Jul 27, 2010
Working with Dean Snyder Construction on an Addition to North High School in Des Moines, including footing, walls, slab, sidewalk and exterior stairs.
view »
POLK CITY S. 3RD ST SIDEWALK & DRAINAGE
Date: Jul 22, 2010
The City of Polk City sees this area of town as being the entrance into their city. Absolute won the contract to provide this for them. This project requires tying into existing storm sewer lines and replacing intakes on the...
view »
MAPLEWOODS VINEYARDS
Date: Jul 21, 2010
Maplewoods Vineyard - Oskaloosa, IA - Scope of Work: Sub base, Slab, Stoops, Exterior paving on a vineyard located in Oskaloosa for Story Construction.
view »
FAREWAY FORT DODGE
STUDEBAKER ELEMENTARY SCHOOL
Date: Jun 14, 2010
Studebaker Elementary School - Des Moines, IA -
Scope of Work: Absolute is the Prime Contractor on this project which consists of complete demo of the exisiting parking lot, re-grade and re-pave new parking lot, add new sidewalk, some adjusting of...
view »
MCCOMBS MIDDLE SCHOOL
Date: Jun 14, 2010
McCombs Middle School - Des Moines, IA -
Scope of Work: Adding a drop off lane and a new sidewalk. Will re-sod when complete.
view »
86th ST. WIDENING
Chamberry Blvd, 86th Street Widening - Johnston, IA - DOT Project - Scope of Work: Retaining Wall; Slipping the curb and performing the widening of 86th St. in Johnston, IA.
view »
ARMY POST ROAD WIDENING
Army Post Road Widening - Des Moines, IA - DOT Project - Scope of Work: 7,058 SY of standard 9" Paving, 508 SY of standard 7" Paving, 2,622 SY of 4" Sidewalk, 75 SY of 6" Sidewalk, 749 SY of...
view »
ALTOONA SOCCER FIELD
Altoona Soccer Field - Altoona, IA - Scope of Work: Misc. Paving, Sidwalk, Curb & Gutter
view »
WEST MARSHALL MIDDLE SCHOOL
Absolute worked with Larson & Larson on this project.
Scope of work includes:
1,312 LF Trench Footings
969 LF of Spread Footings
103 LF of Cast in Place Walls
46,759 SF of Slab
107,065 SF of Paving
20,581 SF of Sidewalk
...
view »
Polk City Broadway Ave Improvements
Polk City, IA - Scope of Work: Colored Concrete Intersection, Curb & Gutter, Driveways, Sidewalk, & Detectable Warnings.
12,000 LF of 5.5' wide 10" thick gutter with 6" curb.
Commander 3 with 5.5' gutter with...
view »
CEDAR FALLS PUBLIC WORKS
Public Works Faciltity - Cedar Falls, IA - Scope of Work: Working with Cardnial Construction in Cedar Falls pouring 105,600 sqft of slab for a large Public Works Facility. Estimated start is Spring 2011, estimated finish Summer 2011
view »
NEVADA HIGH SCHOOL ADDITION
Nevada High School Addition - Nevada, IA - Scope of Work: 700 LF of trench footings, 11,500 sqft of Slab, 128,650 sqft of parking, and 33,800 sqft of sidewalk. This project is an addition to the Nevada High School building,...
view »